Tuesday, July 5, 2011

Palo Duro Canyon State Park

We are making the second stop on our 2011 summer vacation trip in Palo Duro Canyon State Park after spending three days in Wichita Falls visiting my folks.  The location is site 87 in the Mesquite Camping Area.  The weather is hot, but not quite as hot as Wichita Falls.
It appeared to have rained quite a bit Monday afternoon before we arrived as there was a lot of red dirt washed up on the water crossings and some standing water.  There were some clouds and a little thunder Tuesday afternoon, but no more rain.

After taking a partial hike to Lighthouse Peak on Tuesday we just stayed at the campsite and enjoyed the nice view from this part of the canyon.  We packed up and departed for Taos, NM on Wednesday morning.

Monday, May 30, 2011

San Antonio

We are in San Antonio for the Memorial Day weekend.  Saturday was a trip to the River Walk and Sunday we went over to the Market Square.  At the Market Square one of the musical groups playing was Wayanay Inka.  They are from South America and we have seen them here several times before. 

We took a drive today up to Canyon Lake.  On the way back we spotted a very cool place called the Shade Tree Saloon and had lunch there.

Sunday, May 1, 2011

Quintana Beach

Here are some photos from our annual spring trip to Quintana Beach County Park.  It was cloudy most of the weekend and not much chance to test the new solar charging system.
Site No. 25
Several years ago an LNG processing plant was built in Quintana just across from the park much to the displeasure of the local residents.  Today an LNG tanker docked at the plant to unload its cargo.
Huge LNG Tanker Maneuvering into Position to Unload
We had never seen one of these tankers before.  Our neighbor at the camp said it takes them about three days to unload all of the LNG (liquified natural gas).  Once unloaded, the LNG is stored in tanks and converted from liquid back to gas by the plant for distribution in the Freeport area.
LNG Processing Plant
Here are some photos of the local hangout, Bridge Bait Ice House.  It is located under the big bridge going over the waterway to Surfside.
Bridge Bait Ice House
You can sit outside and have drinks and watch the traffic go by on the Intracoastal Waterway.
Patty at Bridge Bait
Boat Traveling the Intracoastal Waterway
We had lunch at Pirate's Alley in Surfside.  The surf was really up.
Beach View from Pirate's Alley Restaurant in Surfside
Original photos of this trip can be viewed at http://gallery.me.com/johntx#100321

Next scheduled adventure:  San Antonio, Memorial Day weekend 2011

Sunday, April 10, 2011

Power On

Yesterday the final connections were made between the solar panels and the controller.  The weather was partly cloudy though and the motorhome was sitting in the driveway partially shaded by some pine trees.  Under these conditions the performance was pretty bad, with the charging current registering less than 3 amps on the Trimetric battery monitor.  It was late in the afternoon, so I decided to put the motorhome back in the storage for the night.

Today, the morning clouds started to clear up around noon so I went back to the storage and backed the rig out into the sunshine for another test.  Much better!  Now the batteries are seeing a charge current of better than 15 amps.  I tilted the panels up 30 degrees using some temporary pieces of wood and the current increased to 18 amps.
Panels Soaking Up The Sun
View From The Top
All Panels Wired In Parallel To A Common Point
The Trimetric monitor was showing a small load on the batteries of approximately 1-2 amps before turning on the solar system (I'm not sure from where yet).  The monitor measures all current into or out of the batteries via a current shunt.  This means that the current from the solar controller is actually 1 or 2 amps higher than that shown on the monitor.  This would put it at 19-20 amps (with monitor showing about 18 amps).  This is right in line with the sum of the rated currents of the panels.
17.9 Amps Net Current Into The Batteries 
The next test was to turn on the Xantrex 2000 watt inverter and power up the 120V system.  I then turned on the 26" LCD HD television, DVD player and the refrigerator (running on propane, but still drawing a small amount of current from the 12V system).  Still getting a net current of 5 amps into the batteries.

That's it!  The system is now operational.  With time left over to watch some of the Masters golf tournament on solar power.

Sunday, April 3, 2011

Solar Panels Installed

The three solar panels were installed on the roof of the motorhome today.  Toward the rear are two Kyocera 135 watt panels and the one in the front is an 85 watt panel made by UL Solar.  All three panels are capable of being tilted left or right to provide increased output in low sun conditions.
View From The Front
Panel Output Wiring
The #6 wires to the solar controller are routed through a roof vent that was added above the rear bedroom closet.  All that remains now is to make the final electrical connection to the panels using MC4 connectors.

Sunday, March 27, 2011

Solar Power

Here is some info on the solar battery charging system that we are currently in the process of adding to the motorhome.  It is our intent to be able to live normally (except for running the air conditioners) and bring the batteries to a full state of charge on reasonably sunny days without plugging in to shore power or running the generator.  The system I am installing is patterned closely after the one described in HandyBob's blog (see "Blogs We Follow").

The system will consist of the following components:

2 Kyocera 135 watt panels (Vmp = 17.7V. Imp = 7.63A)
1 UL Solar 85 watt panel (Vmp = 17.9V, Imp = 4.84A)
1 Morningstar Tristar TS-45 45 amp PWM solar controller
1 Bogart Engineering Trimetric 2025-RV battery monitor
1 Xantrex 2000 watt inverter
4 6V Interstate Workaholic deep cycle batteries (total 464 amp hours)

Below are some photos of the equipment that has been installed so far.
Deep Cycle Battery Compartment
The bundle of wires running down to the batteries on the right hand side includes the following:

#4 AWG cables to solar controller
Battery voltage sense wires to solar controller
Battery temperature sense wires to solar controller
Battery current sense wires from shunt to battery monitor
Battery voltage sense wires to battery monitor

Also shown above are the 60 amp DC circuit breaker and 500A/50mV current shunt.
Xantrex 2000 Watt Inverter
Inverter, Starting Battery & Deep Cycle Battery Compartments
Solar Panel Disconnect (Left) and Tristar Solar Controller
Disconnect and Solar Controller - Covers Closed
In the above photos, a standard one-pole air conditioning disconnect is used to allow the panels to be disconnected from the controller.  Both the disconnect and controller are mounted on the wall of a closet just above the deep cycle batteries.  Note there is no wiring installed yet to the panels.
Trimetric 2025-RV Battery Monitor
The battery monitor shown above is a key part of the system.  After calibration, it can display battery charge status in a simple "percent full" format.  Both current and time are constantly monitored, recording amp-hours in and out of the battery.  It can also display instantaneous battery current, voltage, time since last full charge and time since last equalization.
85 Watt Panel Manufactured by UL Solar
Aluminum Angle Mounting Bracket w/Stainless Steel Hardware
Panel and Cream
Above are some of the last components yet to be installed, the panels themselves.  In parallel with the 85 watt UL Solar panel shown, there will be two Kyocera 135 watt panels, bringing the total ideal maximum output to 355 watts.  The maximum power voltage of the panels is 17.9V and 17.7V respectively, so they should parallel fairly well.

The aluminum angle mounting brackets will attach directly to the motorhome roof with stainless steel lag screws.  All the metal parts used in the installation will be either aluminum or stainless steel.  The panels will be capable of being tilted up to approximately 45 degrees either left or right.  The optimum tilt angle is approximately equal to the latitude of the location and facing due south.  Ideally, the panels should face directly toward the sun at noon.

More info will be coming later after the panels are installed.

Sunday, February 20, 2011

Brazos Bend State Park

It's President's Day weekend 2011 and we are in Brazos Bend Texas State Park.  This park is very full of RVers and we didn't arrive until yesterday (Saturday) so our choice of campsites was pretty limited.  We ended up in this relatively short space which our 38' motorhome barely fit into.

Hanging out in a small space

Brazos Bend is noted for its alligator population which is estimated at around 300.  We took a couple of hikes looking for one but didn't see any this time.  Below is a photo we took of one on a previous trip.

Alligator (2001 Photo)

On Saturday afternoon my friend Dudley and his wife Lisa came to visit us.  Dudley has a friend who works at the George Observatory which is located here in the park.  On Saturday evenings the observatory is open to the public and we were able to get a personal guided tour.  We all got a look at the Orion Nebula through the 36-inch Gueymard Research Telescope, one of the largest available in the U.S. for public viewing.

Some photos of us doing what we're good at (i.e. nothing):



Next scheduled adventure:  Qunitana Beach County Park, near Freeport, Texas on April 29 - May 1.